Frankston Hospital Day Surgery

Frankston Day Surgery was a re-fit project delivered in record time. The project consisted of a full strip out of the existing wing. Then a new procedure rooms, offices and waiting bed's where installed with full medical electrical works package. The lighting was controlled by the Hospitals fully intergrated Dynalite lighting system, The Emergency lighting was connected to the existing monitored system that was existing to the hospital.